CNBCLean R·
Board approves $19.9 billion plan to overhaul Washington Dulles airport
The $6.2 billion reconstruction of the main terminal at the primary international airport serving the D.C. region is set to begin in late 2027.
Read at CNBC →
The $6.2 billion reconstruction of the main terminal at the primary international airport serving the D.C. region is set to begin in late 2027.
<iframe src="https://statesidedaily.com/embed/cluster/0cc4fa5febd663661dfc45262ee818e81418436d" width="100%" height="320" style="border:0;max-width:680px" loading="lazy" title="Board approves $19.9 billion plan to overhaul Washington Dulles airport"></iframe>