CNBCLean R·
Data center construction costs soar 13% in 2026
The demand for large data centers in the U.S. this year, driven by AI needs, grew beyond the supply of powered land and the labor to build these structures.
Read at CNBC →
The demand for large data centers in the U.S. this year, driven by AI needs, grew beyond the supply of powered land and the labor to build these structures.
<iframe src="https://statesidedaily.com/embed/cluster/416be230aaca5cf62a1a67efcc4531c96a6bc031" width="100%" height="320" style="border:0;max-width:680px" loading="lazy" title="Data center construction costs soar 13% in 2026"></iframe>